Most of the time, the actual construction of a project can't be exactly the same as what was planned. There can be many issues that make it difficult to build the project as planned, so small changes may need to be made. After the construction is finished, the project needs to be redrawn to show what was actually built. This is called an as-built project.

2

as built drawing

In projects with changing architecture, it's important to take things one step at a time. If you try to do too much too soon, it could lead to a disaster. So it's best to focus on the task at hand and not try to do too much too quickly.

3

as built drawing

For a construction project to be accepted, it needs to be built close enough to the original plan. The amount of difference allowed between the actual project and the original plan depends on the project.

4

as built drawing

Drawing is like giving your soul away. When you start working on a project, don't keep changing it. Stick to the plan and you will feel like you are in a trance.

5

as built drawing

Clash detection is a goal that can help make the process of building something easier. It can be done by using special software like Revit, Archicad, or Bentley.

6

as built drawing

The project designer had a lot of difficulty while creating the project and it would have been easier to start from the beginning. If there is a lack of resources and an unemployed construction manager, it can be a real challenge.

7

as built drawing

Construction workers follow the plans that were made before they started working and measure the dimensions of the project as they build it. The measurements are then added to the project plans.